Enterasys Networks Smart 2200 User Manual Page 37

  • Download
  • Add to my manuals
  • Print
  • Page
    / 62
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 36
Completing the Installation
Installation 3-11
3.5 COMPLETING THE INSTALLATION
After installing the 2H258-17R and any optional HSIM or VHSIM, and making the connections to
the network, proceed as follows:
1. Secure the cables by running the cables along the strain-relief bracket and tying them to the
strain-relief bracket using cable ties.
2. The 2H258-17R is now ready to be configured through Local Management. Refer to the
SmartSwitch Series 2E253, 2H252, 2H253, and 2H258 Local Management User’s Guide for
information on how to access and use Local Management.
Page view 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 61 62

Comments to this Manuals

No comments